Wangen (Allgäu)Wangen (Allgäu)

Completion of the remodelling work at the station Wangen (Allgäu)

To the station page
Wangen (Allgäu)
Back to top

Discover more content

Copy link to this section

DB WhatsApp Cleaning Service

Scan the QR code on the bin or select the station’s federal state online to start the relevant WhatsApp chat straight away

Rubbish bins with a sticker and a QR code for reporting rubbish via WhatsApp.

House rules

From 15 October, the ban on alcohol consumption will form part of the rules and regulations at all railway stations nationwide. Carrying open containers of alcoholic drinks is also prohibited

Information on the ban on alcohol consumption at Berlin Hbf.

DB Info for when you're out and about

We are expanding the familiar DB Information service into the digital sphere: bahnhof.de is being developed into a provider-neutral platform, which will be available in future as both a website and an app

A young man with a cognitive impairment uses his smartphone, amongst other things, to find his way around the station and get information independently.
DB
  • Select a station
  • Service
  • Discover

Just in time for the Baden-Württemberg Landesgartenschau, the station Wangen (Allgäu) has been given a new lease of life. New colours inspired by the region and local plants now beautify the station. The station forecourt and platforms have also been redesigned as part of the modernisation. A pleasant journey to the Landesgartenschau is now guaranteed.

A person walks through the newly designed pedestrian subway at Wangen (Allgäu) railway station.

During the redesign of Wangen (Allgäu) station, the passenger subway was also modernised and repainted.

The first measures to improve the station began in 2018. This began with the construction of the pedestrian subway and lifts. The extension of the platforms was also started at this time. Now, seven years later, the renovated station is a sight to behold.

Many of the new features are a reference to the Landesgartenschau, which will take place in Wangen from 26 April 2024 to 6 October 2024. If you look closely, you can now see the influence of Allgäu nature and the garden event at the redesigned station. The subway has been tiled in the colours of the Landesgartenschau and an Allgäu flower meadow. The colours can also be found on the transformer house on platform 1. The new platform roof was also given a fresh, green colour. Travellers and visitors can now admire the modern platform from a new, adapted seat. The previous benches were replaced with individual seats as part of the remodelling work, meaning that there is now room for more people than before.

The redesign of the station forecourt also focussed on nature. The pavements and the path to the station building and the subway have been landscaped and are now lined with newly planted trees and plants. Travellers and visitors can now also make themselves comfortable on the station forecourt on so-called open space kits. These are large beds filled with plants from the Allgäu flora and benches have been installed for travellers to relax on.

The so-called open space kits at the station were planted with herbs, grasses and shrubs in the colours of an Allgäu flower meadow.

Deutsch
  • Contact
  • Business customersexternal link
  • Transport operators
  • Changelog
  • Information on accessibility
  • Compliance
  • Privacy policy
  • House rules
  • Publishing Details
  • Terms and conditions of use